CIP liners for mains
Pipe materials cast iron, steel, asbestos, and PVC
Diameter 3" - 24"
Length up to1,000 ft. per line
Operating pressure high pressure (up to 90 psi)
Drip pots can be lined, with proper preparation
Offsets 45° offsets can be lined
Line condition partially deteriorated gas pipes, e. g. holes or gaps up
to 4"
Tees are opened without excavation trenchless with a robotic cutter equipped with a CCTV camera
Adhesive system PU adhesive or epoxy resin
Curing cold or warm
Performance 1 lining section having been lined by one rehabilitation crew (4 workers) can be put back into operation within 12 - 16 hours
Excavation only one small starting and target pit required per section
Special features of the technology: maintains gas-tightness even if the pipe breaks, misalignment of 7° and more possible uniform bonding,
i. e.
no gas migration new service tees can be installed using the utility's standard procedure no significant reduction in pipe capacity
Operational safety after pipe fracture and misaligment