| Pipe
materials |
cast
iron, steel, asbestos, and PVC |
| Diameter |
3"
- 24" |
| Length
|
up
to1,000 ft. per line |
| Operating
pressure |
high
pressure (up to 90 psi) |
| Drip
pots |
can be lined, with proper preparation |
| Offsets |
45°
offsets can be lined |
| Line
condition |
partially
deteriorated gas pipes, e. g. holes or gaps up
to 4" |
| Tees |
are
opened without excavation trenchless with a robotic cutter equipped
with a CCTV camera |
| Adhesive
system |
PU
adhesive or epoxy resin |
| Curing |
cold or warm |
| Performance |
1
lining section having been lined by one rehabilitation crew (4 workers)
can be put back into operation within 12 - 16 hours |
| Excavation
|
only
one small starting and target pit required per section |